info@kbcambodia.com

Category: Education

What is the purpose of test completion criteria in a test plan:

What is the purpose of test completion criteria in a test plan: A. to know when a specific test has finished its execution B. to ensure that the test case specification is complete C. to set the criteria used in…

Which of the following is the main purpose of the integration strategy for integration testing in the small?

Which of the following is the main purpose of the integration strategy for integration testing in the small? A. to ensure that all of the small modules are tested adequately B. to ensure that the system interfaces to other systems…

Which of the following is NOT part of configuration management:

Which of the following is NOT part of configuration management: A. status accounting of configuration items B. auditing conformance to ISO9001 C. identification of test versions D. record of changes to documentation over time E. controlled library access Answer: Option…

Non-functional system testing includes:

Non-functional system testing includes: A. testing to see where the system does not function properly B. testing quality attributes of the system including performance and usability C. testing a system feature using only the software required for that action D.…

Consider the following statements about early test design:

Consider the following statements about early test design: i. early test design can prevent fault multiplication ii. faults found during early test design are more expensive to fix iii. early test design can find faults iv. early test design can…

Which of the following inputs might be a result of designing tests for only valid equivalence classes and valid boundaries:

Which of the following inputs might be a result of designing tests for only valid equivalence classes and valid boundaries: Order numbers on a stock control system can range between 10000 and 99999 inclusive. A. 1000, 5000, 99999 B. 9999,…

Testing should be stopped when:

Testing should be stopped when: A. all the planned tests have been run B. time has run out C. all faults have been fixed correctly D. both a) and c) E. it depends on the risks for the system being…

IEEE 829 test plan documentation standard contains all of the following except:

IEEE 829 test plan documentation standard contains all of the following except: A. test items B. test deliverables C. test tasks D. test environment E. test specification Answer: Option E

Regression testing should be performed:

Regression testing should be performed: v) every week w) after the software has changed x) as often as possible y) when the environment has changed z) when the project manager says A. v & w are true, x – z…

When what is visible to end-users is a deviation from the specific or expected behavior, this is called:

When what is visible to end-users is a deviation from the specific or expected behavior, this is called: A. an error B. a fault C. a failure D. a defect E. a mistake Answer: Option C