Testing should be stopped when:
- A. all the planned tests have been run
- B. time has run out
- C. all faults have been fixed correctly
- D. both a) and c)
- E. it depends on the risks for the system being tested
Answer: Option E
Testing should be stopped when:
Answer: Option E