What determines the level of risk?

  • A. The cost of dealing with an adverse event if it occurs.
  • B. The probability that an adverse event will occur.
  • C. The amount of testing planned before release of a system.
  • D. The likelihood of an adverse event and the impact of the event.

Answer: Option D