Which of the following is a TYPICAL objective of a pilot project for introducing a testing tool into an organisation?

  • A. To assess whether the benefits will be achieved at a reasonable cost
  • B. To identify the initial requirements of the tool
  • C. To select the most suitable tool for the intended purpose
  • D. To document test design and test execution processes

Answer: Option A