Which of the following is a TYPICAL objective of a pilot project for introducing a testing tool into an organisation?
- A. To assess whether the benefits will be achieved at a reasonable cost
- B. To identify the initial requirements of the tool
- C. To select the most suitable tool for the intended purpose
- D. To document test design and test execution processes
Answer: Option A