Which of the following matches the activity (i to iv) to its most suitable type of tool (p to s)? i.

i. Analysis of code structure. ii. Generation of test cases. iii. Simulation of the environment in which a component is run. iv. Analysis of test metrics. p. Test management. q. Test design tool. r. Static analysis tool. s. Test harness.

  • A. i-s, ii-p, iii-r, iv-q
  • B. i-r, ii-q, iii-s, iv-p
  • C. i-r, ii-s, iii-p, iv-q
  • D. i-q, ii-r, iii-s, iv-p

Answer: Option B